发表状态 | 已发表Published |
题名 | BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance |
作者 | |
发表日期 | 2019-11-01 |
发表期刊 | Automation in Construction
![]() |
ISSN/eISSN | 0926-5805 |
卷号 | 107 |
摘要 | The operation and maintenance (O&M) is the longest and costliest phase during the entire building lifecycle. In recent decades, with the rapidly increasing costs of new constructions, the effective maintenance has become more important to the existing buildings, particularly to their fabric components, which include both architectural and structural items for maintaining physical characteristics and ensuring normal performance of the existing building over its lifecycle. However, building maintenance costs are also increasing dramatically and this situation mainly results from the delay of maintenance work due to inefficient maintenance planning for the facility management purpose. The inefficient maintenance planning is caused due to lack of effective methods and techniques for predicting the uncertainties including schedule and costs during the maintenance stage. Therefore, this paper proposes an innovative management workflow design which integrates Building Information Modelling (BIM) with digital programming to implement efficient schedule and cost planning of building fabric maintenance. Through this BIM-based workflow design, the knowledge gap between maintenance theories and practical maintenance management can be narrowed by a consistent and sustainable building information flow, which is highly linked with the design and construction phase. This study makes a contribution to integrating the traditional maintenance management with digital technologies to improve the management performance and maintenance efficiency of the O&M phase in the future. |
关键词 | Building fabric maintenance Building information modelling (BIM) Cost and schedule planning Digital programming Integration Management workflow |
DOI | 10.1016/j.autcon.2019.102944 |
URL | 查看来源 |
收录类别 | SCIE |
语种 | 英语English |
WOS研究方向 | Construction & Building Technology ; Engineering |
WOS类目 | Construction & Building Technology ; Engineering, Civil |
WOS记录号 | WOS:000494887600030 |
Scopus入藏号 | 2-s2.0-85071843152 |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | https://repository.uic.edu.cn/handle/39GCC9TT/11875 |
专题 | 个人在本单位外知识产出 |
通讯作者 | Chen, Chao |
作者单位 | 1.University of Nottingham Ningbo China,Ningbo,199 Taikang East Road, University Park,315100,China 2.University of Hong Kong,Hong Kong,Hong Kong |
推荐引用方式 GB/T 7714 | Chen, Chao,Tang, Llewellyn. BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance[J]. Automation in Construction, 2019, 107. |
APA | Chen, Chao, & Tang, Llewellyn. (2019). BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance. Automation in Construction, 107. |
MLA | Chen, Chao,et al."BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance". Automation in Construction 107(2019). |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
查看访问统计 |
谷歌学术 |
谷歌学术中相似的文章 |
[Chen, Chao]的文章 |
[Tang, Llewellyn]的文章 |
百度学术 |
百度学术中相似的文章 |
[Chen, Chao]的文章 |
[Tang, Llewellyn]的文章 |
必应学术 |
必应学术中相似的文章 |
[Chen, Chao]的文章 |
[Tang, Llewellyn]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论