发表状态 | 已发表Published |
题名 | Accounting for tailings dam failures in the valuation of mining projects |
作者 | |
发表日期 | 2019-10 |
发表期刊 | Resources Policy
![]() |
ISSN/eISSN | 0301-4207 |
卷号 | 63 |
摘要 | The number of major tailings dam failures has doubled over the past 20 years, culminating in the tragic accident at Brumadinho in Brazil where about 300 people lost their lives. In this context, there is a growing demand from mining companies, institutional investors and policymakers alike for updated mining project assessment tools taking account of such risks. As part of this research, this paper develops a real option framework for evaluating mining projects involving tailings dams and their associated risk. Two options are considered beyond standard business-as-usual safety measures: reinforced dam maintenance, and retrofitting a treatment process that reduces the volume of unconsolidated tailings. A closed-form expression was obtained for the expected value of the business-as-usual case; semi-analytic formulas were obtained for the two options for evaluation by dynamic programming with quantization of the price factor. When applied to an iron ore deposit with characteristics similar to the Samarco deposit, the method shows that both options are financially superior to business-as-usual for the mining company, with the dry processing retrofitting option being the most attractive. The sensitivity of the expected values was evaluated over a range of values of the key parameters. This research provides senior decision-makers with tools to evaluate different options regarding tailings dam safety from a financial point of view, and provides financial evidence in favour of safer treatment processes for mining waste. |
关键词 | Dry processing Preventive maintenance Quantization Real options |
DOI | 10.1016/j.resourpol.2019.101461 |
URL | 查看来源 |
收录类别 | SSCI |
语种 | 英语English |
WOS研究方向 | Environmental Sciences & Ecology |
WOS类目 | Environmental Studies |
WOS记录号 | WOS:000488888100053 |
Scopus入藏号 | 2-s2.0-85070410585 |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | https://repository.uic.edu.cn/handle/39GCC9TT/9649 |
专题 | 个人在本单位外知识产出 理工科技学院 |
通讯作者 | Langrené, Nicolas |
作者单位 | 1.Escuela de Negocios,Universidad Adolfo Ibáñez,Santiago,Chile,Center for Mathematical Modelling,University of Chile,Santiago,Chile 2.Data61,Commonwealth Scientific and Industrial Research Organisation,RiskLab,Australia 3.Universidade Federal Do Rio Grande Do Sul,Porto Alegre,Brazil |
推荐引用方式 GB/T 7714 | Armstrong, Margaret,Langrené, Nicolas,Petter, Renatoet al. Accounting for tailings dam failures in the valuation of mining projects[J]. Resources Policy, 2019, 63. |
APA | Armstrong, Margaret, Langrené, Nicolas, Petter, Renato, Chen, Wen, & Petter, Carlos. (2019). Accounting for tailings dam failures in the valuation of mining projects. Resources Policy, 63. |
MLA | Armstrong, Margaret,et al."Accounting for tailings dam failures in the valuation of mining projects". Resources Policy 63(2019). |
条目包含的文件 | 条目无相关文件。 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论