Details of Research Outputs

Status已发表Published
TitleBIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance
Creator
Date Issued2019-11-01
Source PublicationAutomation in Construction
ISSN0926-5805
Volume107
Abstract

The operation and maintenance (O&M) is the longest and costliest phase during the entire building lifecycle. In recent decades, with the rapidly increasing costs of new constructions, the effective maintenance has become more important to the existing buildings, particularly to their fabric components, which include both architectural and structural items for maintaining physical characteristics and ensuring normal performance of the existing building over its lifecycle. However, building maintenance costs are also increasing dramatically and this situation mainly results from the delay of maintenance work due to inefficient maintenance planning for the facility management purpose. The inefficient maintenance planning is caused due to lack of effective methods and techniques for predicting the uncertainties including schedule and costs during the maintenance stage. Therefore, this paper proposes an innovative management workflow design which integrates Building Information Modelling (BIM) with digital programming to implement efficient schedule and cost planning of building fabric maintenance. Through this BIM-based workflow design, the knowledge gap between maintenance theories and practical maintenance management can be narrowed by a consistent and sustainable building information flow, which is highly linked with the design and construction phase. This study makes a contribution to integrating the traditional maintenance management with digital technologies to improve the management performance and maintenance efficiency of the O&M phase in the future.

KeywordBuilding fabric maintenance Building information modelling (BIM) Cost and schedule planning Digital programming Integration Management workflow
DOI10.1016/j.autcon.2019.102944
URLView source
Indexed BySCIE
Language英语English
WOS Research AreaConstruction & Building Technology ; Engineering
WOS SubjectConstruction & Building Technology ; Engineering, Civil
WOS IDWOS:000494887600030
Scopus ID2-s2.0-85071843152
Citation statistics
Cited Times:74[WOS]   [WOS Record]     [Related Records in WOS]
Document TypeJournal article
Identifierhttp://repository.uic.edu.cn/handle/39GCC9TT/11875
CollectionResearch outside affiliated institution
Corresponding AuthorChen, Chao
Affiliation
1.University of Nottingham Ningbo China,Ningbo,199 Taikang East Road, University Park,315100,China
2.University of Hong Kong,Hong Kong,Hong Kong
Recommended Citation
GB/T 7714
Chen, Chao,Tang, Llewellyn. BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance[J]. Automation in Construction, 2019, 107.
APA Chen, Chao, & Tang, Llewellyn. (2019). BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance. Automation in Construction, 107.
MLA Chen, Chao,et al."BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance". Automation in Construction 107(2019).
Files in This Item:
There are no files associated with this item.
Related Services
Usage statistics
Google Scholar
Similar articles in Google Scholar
[Chen, Chao]'s Articles
[Tang, Llewellyn]'s Articles
Baidu academic
Similar articles in Baidu academic
[Chen, Chao]'s Articles
[Tang, Llewellyn]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[Chen, Chao]'s Articles
[Tang, Llewellyn]'s Articles
Terms of Use
No data!
Social Bookmark/Share
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.