Status | 已发表Published |
Title | BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance |
Creator | |
Date Issued | 2019-11-01 |
Source Publication | Automation in Construction
![]() |
ISSN | 0926-5805 |
Volume | 107 |
Abstract | The operation and maintenance (O&M) is the longest and costliest phase during the entire building lifecycle. In recent decades, with the rapidly increasing costs of new constructions, the effective maintenance has become more important to the existing buildings, particularly to their fabric components, which include both architectural and structural items for maintaining physical characteristics and ensuring normal performance of the existing building over its lifecycle. However, building maintenance costs are also increasing dramatically and this situation mainly results from the delay of maintenance work due to inefficient maintenance planning for the facility management purpose. The inefficient maintenance planning is caused due to lack of effective methods and techniques for predicting the uncertainties including schedule and costs during the maintenance stage. Therefore, this paper proposes an innovative management workflow design which integrates Building Information Modelling (BIM) with digital programming to implement efficient schedule and cost planning of building fabric maintenance. Through this BIM-based workflow design, the knowledge gap between maintenance theories and practical maintenance management can be narrowed by a consistent and sustainable building information flow, which is highly linked with the design and construction phase. This study makes a contribution to integrating the traditional maintenance management with digital technologies to improve the management performance and maintenance efficiency of the O&M phase in the future. |
Keyword | Building fabric maintenance Building information modelling (BIM) Cost and schedule planning Digital programming Integration Management workflow |
DOI | 10.1016/j.autcon.2019.102944 |
URL | View source |
Indexed By | SCIE |
Language | 英语English |
WOS Research Area | Construction & Building Technology ; Engineering |
WOS Subject | Construction & Building Technology ; Engineering, Civil |
WOS ID | WOS:000494887600030 |
Scopus ID | 2-s2.0-85071843152 |
Citation statistics | |
Document Type | Journal article |
Identifier | http://repository.uic.edu.cn/handle/39GCC9TT/11875 |
Collection | Research outside affiliated institution |
Corresponding Author | Chen, Chao |
Affiliation | 1.University of Nottingham Ningbo China,Ningbo,199 Taikang East Road, University Park,315100,China 2.University of Hong Kong,Hong Kong,Hong Kong |
Recommended Citation GB/T 7714 | Chen, Chao,Tang, Llewellyn. BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance[J]. Automation in Construction, 2019, 107. |
APA | Chen, Chao, & Tang, Llewellyn. (2019). BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance. Automation in Construction, 107. |
MLA | Chen, Chao,et al."BIM-based integrated management workflow design for schedule and cost planning of building fabric maintenance". Automation in Construction 107(2019). |
Files in This Item: | There are no files associated with this item. |
Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.
Edit Comment