Details of Research Outputs

Status已发表Published
TitleOptimal strategy modeling for price-time biparameter construction bidding
Creator
Date Issued2009
Source PublicationJournal of Construction Engineering and Management
ISSN0733-9364
Volume135Issue:4Pages:298-306
Abstract

In the price-time biparameter construction bidding system, each contractor submits a bid price and construction time to complete the project, which are then aggregated to a total combined bid (TCB) by the client, and the contractor with the lowest TCB is awarded the project. Since bid price can be set as construction cost plus an appropriate markup and construction cost usually depends on construction time, TCB can be expressed as a function of time. By minimizing such a TCB function, the optimal construction time can be obtained, from which the optimal construction cost and bid price and hence the optimal price-time bidding strategy can be sequentially decided. While examining the whole optimal bidding process, this paper focuses on three aspects to enhance the key ideas: discussing the properties of the general and the quadratic time-cost functions, deducing the optimal bidding formulas with quadratic time-cost relationship, and illustrating the procedures for estimating the quadratic time-cost function using a few experience data and the linear regression method. The in-depth examination of the price-time biparameter bidding model in the paper can suggest ideas and methodologies to construction bidding or contractor selection with more criteria. © 2009 ASCE.

KeywordBids Construction costs Estimation Optimization models Parameters Regression analysis
DOI10.1061/(ASCE)0733-9364(2009)135:4(298)
URLView source
Language英语English
Scopus ID2-s2.0-62549109987
Citation statistics
Cited Times:7[WOS]   [WOS Record]     [Related Records in WOS]
Document TypeJournal article
Identifierhttp://repository.uic.edu.cn/handle/39GCC9TT/8523
CollectionResearch outside affiliated institution
Affiliation
1.Univ. of South Australia,School of Mathematics and Statistics,City West Campus,70 North Terrace,Adelaide, SA 5000,Australia
2.City Univ. of Hong Kong,Dept. of Management Sciences,83 Tat Chee Ave,Kowloon,Hong Kong
Recommended Citation
GB/T 7714
Wu, Minglu,Lo, Hing Po. Optimal strategy modeling for price-time biparameter construction bidding[J]. Journal of Construction Engineering and Management, 2009, 135(4): 298-306.
APA Wu, Minglu, & Lo, Hing Po. (2009). Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), 298-306.
MLA Wu, Minglu,et al."Optimal strategy modeling for price-time biparameter construction bidding". Journal of Construction Engineering and Management 135.4(2009): 298-306.
Files in This Item:
There are no files associated with this item.
Related Services
Usage statistics
Google Scholar
Similar articles in Google Scholar
[Wu, Minglu]'s Articles
[Lo, Hing Po]'s Articles
Baidu academic
Similar articles in Baidu academic
[Wu, Minglu]'s Articles
[Lo, Hing Po]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[Wu, Minglu]'s Articles
[Lo, Hing Po]'s Articles
Terms of Use
No data!
Social Bookmark/Share
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.