Abstract

Most of the building renovation plans are usually decided in the early design stage. This delicate phase contains the greatest opportunity to achieve the high energy performance buildings after refurbishment. It is therefore important to provide the pertinent energy performance information for the designers or decision-makers from multidisciplinary and comparative points of view. This paper investigates the renovation concept of a novel loop-heat-pipe based solar thermal facade (LHP-STF) installed on a reference residential building by technical evaluation and economic analysis in three typical European climates, including North Europe (represented by Stockholm), West Europe (represented by London) and South Europe (represented by Madrid). The aim of this paper is firstly to explore the LHP-STF's sensitivity with regards to the overall building socio-energy performance and secondly to study the LHP-STF's economic feasibility by developing a dedicated business model. The reference building model was derived from the U.S. Department of Energy (DOE) commercial buildings research, in which the energy data for the building models were from the ASHRAE codes and other standard practices. The financial data were collected from the European statistic institute and the cost of system was based on the manufactured prototype. Several critical financial indexes were applied to evaluate the investment feasibility of the LHP-STF system in building renovation, such as Payback Period (PP), Net Present Value (NPV), and the modified internal rate of return method (IRR). Four common investment options were considered in this business model, including buying outright (BO), buying by instalment (BI), energy efficiency funding (EEF) and power purchase agreement (PPA). The research results indicate that the LHP-STF could contribute to the hot water load throughout the year with substantially reduced heating load in winter, and yet a slight increased cooling load in summer. Among four investment options, the BO was considered as the best investment method with the highest NPV, IRR and the shortest payback period. With regards to relatively limited solar resources, London was found to be the best place for investment with the highest economical revenues and an attractive payback period of less than four years for all purchase options. Although Madrid has the richest solar resource, this system has the lowest economic profit and the longest payback period. This outcome confirms that the renewable energy incentives have a higher impact than solar resources on current solar thermal facade technologies under such pricing fundamentals. This multidisciplinary research is expected to be helpful for the strategic decisions at the early design stage for building renovation with the proposed system and further promote development of solar driven service system, leading to the savings in fossil fuel consumption and reduction in carbon emission.

KeywordBuilding load Business model Financial indexes Loop heat pipe (LHP) Solar thermal facade
DOI10.1016/j.enconman.2015.10.034
URLView source
Indexed BySCIE
Language英语English
WOS Research AreaThermodynamics ; Energy & Fuels ; Mechanics
WOS SubjectThermodynamics ; Energy & Fuels ; Mechanics
WOS IDWOS:000366063500089
Scopus ID2-s2.0-84944890042
Citation statistics
Cited Times:21[WOS]   [WOS Record]     [Related Records in WOS]
Document TypeJournal article
Identifierhttp://repository.uic.edu.cn/handle/39GCC9TT/11907
CollectionResearch outside affiliated institution
Corresponding AuthorZhang, Xingxing
Affiliation
1.Department of Architecture and Built Environment, University of Nottingham, Ningbo, United Kingdom
2.School of Engineering, University of Hull, Hull, United Kingdom
3.Department of Building Environment and Equipment, Hefei University of Technology, China
4.School of Environment and Energy Engineering, Beijing University of Civil Engineering and Architecture, China
Recommended Citation
GB/T 7714
Zhang, Xingxing,Shen, Jingchun,Adkins, Deborahet al. The early design stage for building renovation with a novel loop-heat-pipe based solar thermal facade (LHP-STF) heat pump water heating system: Techno-economic analysis in three European climates[J]. Energy Conversion and Management, 2015, 106: 964-986.
APA Zhang, Xingxing., Shen, Jingchun., Adkins, Deborah., Yang, Tong., Tang, Llewellyn., .. & Luo, Huizhong. (2015). The early design stage for building renovation with a novel loop-heat-pipe based solar thermal facade (LHP-STF) heat pump water heating system: Techno-economic analysis in three European climates. Energy Conversion and Management, 106, 964-986.
MLA Zhang, Xingxing,et al."The early design stage for building renovation with a novel loop-heat-pipe based solar thermal facade (LHP-STF) heat pump water heating system: Techno-economic analysis in three European climates". Energy Conversion and Management 106(2015): 964-986.
Files in This Item:
There are no files associated with this item.
Related Services
Usage statistics
Google Scholar
Similar articles in Google Scholar
[Zhang, Xingxing]'s Articles
[Shen, Jingchun]'s Articles
[Adkins, Deborah]'s Articles
Baidu academic
Similar articles in Baidu academic
[Zhang, Xingxing]'s Articles
[Shen, Jingchun]'s Articles
[Adkins, Deborah]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[Zhang, Xingxing]'s Articles
[Shen, Jingchun]'s Articles
[Adkins, Deborah]'s Articles
Terms of Use
No data!
Social Bookmark/Share
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.